Selayang MP William Leong today questioned the risks of having two waste-to-energy (WTE) incinerators operating simultaneously within a 15km radius in Rawang.
The first incinerator is the proposed Sultan Idris Shah (SIS) WTE Green Energy Plant under the purview of the Selangor state government.
The second is the relocated WTE incinerator by the Housing and Local Government Ministry which was initially planned to be built at Taman Beringin, Kepong, and was later moved to Rawang.
The first incinerator is the proposed Sultan Idris Shah (SIS) WTE Green Energy Plant under the purview of the Selangor state government.
The second is the relocated WTE incinerator by the Housing and Local Government Ministry which was initially planned to be built at Taman Beringin, Kepong, and was later moved to Rawang.
- Category
- TV Saluran - TV Channel
- Tags
- Kinitv, Malaysia, politics
Sign in or sign up to post comments.
Be the first to comment