The Electric Train Service (ETS) route from Kampar to Ipoh is expected to be back in operation Sunday morning after the clean-up efforts to remove the derailed train carriages from the track were almost finished, said Keretapi Tanah Melayu Bhd (KTM) chairman Datuk Nawawi Ahmad.
- Category
- TV Saluran - TV Channel
Sign in or sign up to post comments.
Be the first to comment
Up Next
Autoplay
-
Hospital penting untuk penduduk Kampar
by admin 123 Views -
Firefly to resume flights to Singapore from April 21
by admin 80 Views -
Pak Nasir dah lepas pekan Kampar
by admin 173 Views -
AirAsia will not resume flights to London
by admin 129 Views -
Huge turn out for MCA Kampar ceramah
by admin 138 Views -
‘Ringgit tak pernah cecah RM4.98’ - MP Kampar betulkan MP PAS
by ava 21 Views -
Add 'Director' to Andrew Rannells's Resume
by ava 109 Views -
Ipoh Diary : Insights on Ipoh today
by admin 166 Views -
MCA veep Lee Chee Leong to contest in Kampar
by admin 126 Views -
Menangkap Ikan Di Sungai Kampar | SI BOLANG (14/12/22)
by ava 54 Views -
Kanye West Set To Resume Tour With These MAJOR Changes
by admin 96 Views -
Driving schools may resume classes with strict SOP
by ava 59 Views -
Three killed and two injured in accident near Kampar
by admin 136 Views -
Friday prayers to resume in several states, with conditions
by ava 66 Views -
‘Ringgit tak pernah cecah RM4.98’ - MP Kampar betulkan MP PAS
by ava 14 Views -
Dr M: ECRL project will only resume if the price is right
by admin 72 Views -
The intense rivalry between Malaysia and Singapore set to resume
by admin 134 Views -
Search for two missing students to resume Tuesday
by admin 171 Views -
Liow: Search for MH370 may resume in January
by admin 212 Views -
Australia: MH370 search could resume in the future
by admin 134 Views -
Menangkap Ikan Di Sungai Kampar | SI BOLANG (09/05/23)
by ava 45 Views -
Shafee on MC, Najib's trial to resume on Aug 12
by ava 40 Views
Add to playlist
Sorry, only registred users can create playlists.