Hot Rod Week To Wicked Presented by Duralast, Day 5 Recap

Loading...

Thanks! Share it with your friends!

You disliked this video. Thanks for the feedback!

Added by admin
13 Views
Day 5 Recap. Today’s work consisted of adding all the necessary fluids- motor oil, gear lube, power steering fluid, and coolant. Since Gearstar ships their transmissions full of fluid, all the crew needed to do to it was top it off. They also installed and wired in the new Dakota Digital gauges, installed the power steering lines, and added a new Lokar throttle cable and transmission dipstick. Next up was to run the lines to the transmission cooler, bolt on the wheels and tires, and fire up the engine!
Category
Kereta - Car

Post your comment

Sign in or sign up to post comments.

Comments

Be the first to comment