The Kuala Lumpur City Hall (DBKL) will cooperate with the Department of Irrigation and Drainage (DID) to build a high-capacity groundwater storage tunnel to overcome the issue of flash floods in the nation’s capital.
Federal Territories Minister Shahidan Kassim said this was one of the long-term solutions that will take about three to five years to be completed.
He said DBKL will carry out a feasibility study on the location and specification of the groundwater storage tunnel that will be completed within three months.
Federal Territories Minister Shahidan Kassim said this was one of the long-term solutions that will take about three to five years to be completed.
He said DBKL will carry out a feasibility study on the location and specification of the groundwater storage tunnel that will be completed within three months.
- Category
- TV Saluran - TV Channel
- Tags
- kinitv, malaysia, politics
Sign in or sign up to post comments.
Be the first to comment