Bukit Bintang City Centre (BBCC) CEO Datuk Richard Ong says the BBCC mall will cost RM1.6bil, other components including office tower, apartments, entertainment centre to cost RM2.4bil.
- Category
- TV Saluran - TV Channel
Sign in or sign up to post comments.
Be the first to comment
Up Next
Autoplay
-
IGP: Police into second phase of investigations into 1MDB
by admin 98 Views -
Several other states could move into phase two of NRP, says Muhyiddin
by ava 55 Views -
Lil Nas X PRAYED Being Gay Was A Phase That Would Go Away!
by admin 87 Views -
BBCC to start construction in Q3 2016
by admin 105 Views -
Police complete first phase of 1MDB probe
by admin 144 Views -
MRT Phase 2: A feat of engineering, a work of art
by admin 95 Views -
PM unveils four-phase National Recovery Plan
by ava 50 Views -
Loke: Phase 2 of Klang Valley double-track rail project to resume at a lower cost
by admin 72 Views -
First phase of blueprint showing tangible results
by admin 166 Views -
Hishammuddin: Whole country will be in Phase 4 of NRP from Jan 3
by ava 48 Views -
Nightclubs not allowed to operate during endemic phase
by ava 52 Views -
SRC trial: Company received RM4bil loan from KWAP, RM20mil grant from govt, says ex-board member
by admin 64 Views -
First phase of KVMRT begins operation on Dec 16
by admin 131 Views -
BBCC to lure buyers with location, quality, design & service
by admin 107 Views -
PM checks out second phase of Sg Buloh – Kajang MRT line
by admin 124 Views -
Phase One route of MRT SBK line
by admin 161 Views -
RM4bil with interest due in September 2015
by admin 126 Views -
Phase 2 of MRT Line 1 is 99% ready
by admin 152 Views -
PDRM to phase out firearms permit for hunting
by admin 96 Views -
Be patient, second phase of aid will be distributed in May
by ava 63 Views -
'RM4bil a small fraction of Taib family fortune'
by admin 138 Views -
Khairy: Over 700,000 seniors still unvaccinated in Phase 2
by ava 47 Views
Add to playlist
Sorry, only registred users can create playlists.